Must-Have Items on a Scope of Work (SOW)

Posted on Posted in Uncategorized

scope-of-work

How to Write a Solid Statement of Work (SOW)

The Statement of Work, sometimes called the scope of work, can do a great

How to Write a Solid Statement of Work (SOW)
The Statement of Work, sometimes called the scope of work, can do a great construction contract even better. A well-written statement of work must be clear, complete, logical and concise enough to be understood by the contractor and the construction manager that will be providing the administrative portion of the contract. The SOW must describe in details the expected performance of the contractor, converting it into a measuring tool for the construction manager.
The scope of work must be prepared with help from corresponding departments and professionals that will eventually take part in the developing and construction process. For example, a scope work for a drywall contractor will include types of interior finishes required, designs, material needed, prices and budget

even better. A well-written statement of work must be clear, complete, logical and concise enough to be understood by the contractor and the construction manager that will be providing the administrative portion of the contract. The SOW must describe in details the expected performance of the contractor, converting it into a measuring tool for the construction manager.

 The scope of work must be prepared with help from corresponding departments and professionals that will eventually take part in the developing and construction process. For example, a scope work for a drywall contractor will include types of interior finishes required, designs, material needed, prices and budget the deadline, special requirements, etc.